Manufacturing plant - process load

2 posts / 0 new
Last post

I looked through the archives but did not reach any conclusion - how do
folks deal with manufacturing equipment loads - are they included as part of
process load? This is for LEED 2.2.
Thanks for any insights.
- Rohini

R B's picture
R B
Offline
Joined: 2011-09-30
Reputation: 4

Yes, manufacturing equipment must be included in process load. Using
G2.5 you can submit exceptional calculations showing process load
reduction to claim savings there.

Jeremy R. Poling, PE, LEED AP+BDC

Jeremy Poling2's picture
Offline
Joined: 2011-09-30
Reputation: 0