LEED EAp1 baseline problem

3 posts / 0 new
Last post

Hello All,

I am trying to establish the baseline model for LEED NC 3.0, and have some
problem as following:

1. From ASHRAE 90.1 2007 G3.1.2.8, does it mean that I can simulation the
supply airflow rate by
setting MIN-SUPPLY-T & DESIGN-COOL-T have 20 degree difference and let
eQUEST to calculate the
supply airflow automatically?
2. My baseline HVAC is system No.8, VAV with PFP boxes, so from G3.1.3.12,
the supply air temperature reset must depend on the load, but I can't find
this setting option in eQUEST, could anybody tell me how to set that?
3.Because I am not in a LEED project, could anyone send me the LEED NC3.0
"EAp2 Section 1.4 table.xls" to check if there is anything I loss?

Thanks in advance,

Stan Ho

Stan Ho's picture
Offline
Joined: 2011-09-30
Reputation: 0