LEED and outdoor air rates

2 posts / 0 new
Last post

My proposed building is a long term care facility with a 100% OA unit serving the patient rooms.? The generated baseline LEED model does not reflect this above average OA requirement.? For the purposes of LEED Canada, would the approach be to increase the OA flow rates for each space equal to the proposed design?? It would seem to me both cases should be modelled the same in this respect.? Thanks.

Brad Robinson.

Brad Robinson's picture
Offline
Joined: 2011-09-30
Reputation: 0