Dear equest-users,
For a large LEED-project I have to remodel my HVAC sytems:?
In reality groundwater source heat pumps supply heating and
cooling with additional cooling during peak periods provided by an
additional chiller. However, my proposed simulation model does not
include (yet) water side loops. Instead, I have introduced air-cooled
condensers. I thought it would be O.K. But the LEED reviewers
seem to be very unhappy with my idea. Now, I have to introduce
the whole (very complicated) water-side HVAC components to my
model. Is this possible with equest ? Do I have to delete all my air-side
HVAC systems (17 VAV systems) ? What could be the most elegant way
to introduce the water loops ? I am trying a lot. But the software seems
to crash when I introduce water side HVAC systems. Thanks a lot in advance
Matt