I have a large 4 story building that i am modeling that is about 50 % lab
space set to 12 ACH and 100% OA and constant volume. I have created a
parametric run to turn down to 6 ACH and i am getting the same CFM and
utility bill information. Is there something i might be missing as an input
to either the model or the parametric run?
any help is greatly appreciated,
--
Rob Hudson