Has anyone modeled a hybrid geothermal system where well field is sized
for 40% of the heating load and there are supplemental boilers to cover
the rest of the heating load?
I am about ready to start the model and I am looking for suggestions. I
do not believe that I can add boilers to the Ground Source Heat Pump
Water Loop but I can add it to a Water Source Heat Pump Water Loop.
Your suggestions/comments are appreciated.
Otto