Hello all,
I?m working on a CI project that its C&S had a RTU with VAV boxes.
The interior zones in the CI (proposed design) use the same RTU but with
series fan power VAV boxes. To model this project correctly per Appendix G
(for EAc3.1 credit) should I select PUI system and then change the terminal
type of C&S zones from parallel PIU to standard VAV terminal or there are
other ways to model this CI project in eQUEST?
Thank you for your help,
Morteza
Hi Brian,
For EAp2 we have to use Section 11 but to achieve EAc1.3 (Optimize Energy
Performance ? HVAC) there is an option that allows you to use Appendix G.
Following paragraph is from page 171 of the reference guide.
Thanks,
Morteza
[image: Inline image 1]
Are you sure that you can use appendix G for CI? I thought that CI
required that you use the Energy Cost Budget Method (ie chapter 11).
*Brian Davis, PE, CEM*
Dwyer Engineering
552 Fort Evans Road NE
Suite 200
Leesburg, VA 20176
703-777-5988 x110 (office)
703-439-2588 (fax)
304-582-7689 (cell)
www.dwyer.com
I truly appreciate if anyone provides some feedback on my question below?
Thanks,
---------- Forwarded message ----------