How to change the name on a LV-I, LV-H and SV-A report?

2 posts / 0 new
Last post

Further, from within the eQuest interface you can actually define / revise the TITLE lines as parametric inputs.

This can be a handy option if you?re trying to clearly document parametric runs in part with SIM report outputs. You can for example add a line that clearly indicates rotations 90 / 180 / 270 for a LEED submission, or similar.

Here?s an example of what happens when you utilize each of the 5 line options, for reference. Note that coming out of wizards, usually only TITLE LINE-1 is populated, with just the project name:
[cid:image004.png at 01D459A7.3E217EA0]
[cid:image005.png at 01D459A7.3E217EA0]

[cid:image001.png at 01D459A6.3996E2E0]
Nick Caton, P.E., BEMP
Senior Energy Engineer
Regional Energy Engineering Manager
Energy and Sustainability Services
Schneider Electric

D 913.564.6361
M 785.410.3317
F 913.564.6380
E nicholas.caton at schneider-electric.com

15200 Santa Fe Trail Drive
Suite 204
Lenexa, KS 66219
United States

[cid:image002.png at 01D459A6.3996E2E0]

Nicholas.Caton at schneider-electric.com's picture
Joined: 2016-02-26
Reputation: 0