For LEED baseline system type 5, the Supply Air Temperature for cooling
"shall be reset higher by 5 degrees F under the minimum cooling load
conditions."
I take this to mean under Capacity Control, I should select "Temp Reset
by Greatest Zone Demand" and set the Max Supply Temperature to 60
degrees since I have the Supply Temp set to 55 degrees. Reading the Help
description on this setting makes me think otherwise, but there doesn't
appear to be a better option.
I've attached a screen shot of the cooling settings:
Perhaps the tech team could post a guide on how to properly execute all
of the LEED / Appendix G requirements for each system type in HAP.
Thanks for your help!
Matt Scott
N.E. Fisher & Associates, Inc.
329 East Second St, 2nd Flr
Boyertown, PA 19512
e: mscott at nefisher.com
p: 610-369-3190
f: 610-369-3194