Does anyone know if there is a way to schedule unit operation based on OA? For reference I have a building that uses ERUs and they shut off below ~35?F and above ~80?F (I'm aware this is backwards). In the model I would like to be able to shedule the units so that they would only operate within this temperature range. Does anybody have any suggestions?
Adam E. Towell