Dear equest experts,
I have following issue.
Accorting ASHRAE 90.1.2010 table G3.1.1A my baseline building is following:
System 8-VAV with PFP Boxes
More specific according table G3.1.1B. The system is
VAV with Parallel rooftop VAV with reheat, Fan control VAV, Cooling type
Chilled Water, Heating type electric resistance.
1) To model this system in equest I have choosen PIU system in equest (see
following screenshot)
[image: image.png]
2) In the heating table I have completed as following
[image: image.png]
Do you find these choice correct?
Do you have any suggestions?
3) How shall I treat the humidity control in the baseline building ? Is it
the same with proposed building?
[image: image.png]
Thank you very much.
The answers I get from this forum are always helpful.
Best regards
Konstantina Kalliakoudi
Mechanical Engineer ?.Sc.
www.khmoe.gr