For glazing, you have to enter the GLASS-CONDUCTANCE into eQuest, not the glazing U-value. See page 65 in the DOE22Vol2-Dictionary reference manual available for download at doe2.com.

Christopher Jones, P.Eng.
Tel: 416.644.4226 * Toll Free: 1.888.425.7255 x 527

Chris Jones
crollinjones's picture
Offline
Joined: 2013-12-12
Reputation: 0

Dear all, I have a problem reporting baseline case for LEED submission, where the exterior walls and windows U-values in Report LV-D appears less than the ASHRAE G 90.1 values that I did enter to the model, and this is (as I think) because eQuest adds the exterior air-film effect to the assembly during the run.
My question is that; can I disable this eQuest calculation to see my input directly in LV-D report or not?
Thanks,
Omar ElRawy, LEED AP BD+C
LEED Project Manager
EA Sustainable Building Consultants
http://www.ea-buildingconsultants.com/

Omar ElRawy, LEED AP BD+C LEED Project Manager, EA Sustainable Building Consultants www.ea-buildingconsultants.com
Omar Osama's picture
Offline
Joined: 2011-11-12
Reputation: 0

The LV-D reports (and others touching on windows/constructions) do indeed
include an exterior air film. I don?t know of a way to change that.

A quick screengrab of your (correct) inputs and a one-line explanation of
that fact is probably your most expedient path forward for a LEED review
response.

~Nick

*NICK CATON, P.E.*
*Owner*

*Caton Energy Consulting*
1150 N. 192nd St., #4-202

Shoreline, WA 98133
office: 785.410.3317

www.catonenergy.com

*From:* Equest-users [mailto:equest-users-bounces at lists.onebuilding.org] *On
Behalf Of *Jones, Christopher
*Sent:* Monday, December 22, 2014 8:23 AM
*To:* Omar ElRawy; equest
*Subject:* Re: [Equest-users] Exterior Air Film

For glazing, you have to enter the GLASS-CONDUCTANCE into eQuest, not the
glazing U-value. See page 65 in the DOE22Vol2-Dictionary reference manual
available for download at doe2.com.

*Christopher Jones**,* P.Eng.
Tel: 416.644.4226 ? Toll Free: 1.888.425.7255 x 527

*From:* Equest-users [mailto:equest-users-bounces at lists.onebuilding.org
] *On Behalf Of *Omar ElRawy
*Sent:* Monday, December 22, 2014 7:28 AM
*To:* equest
*Subject:* [Equest-users] Exterior Air Film

Dear all,

I have a problem reporting baseline case for LEED submission,
where the exterior walls and windows U-values in Report LV-D appears less
than the ASHRAE G 90.1 values that I did enter to the model, and this is
(as I think) because eQuest adds the exterior air-film effect to the
assembly during the run.

My question is that; can I disable this eQuest calculation to see my input
directly in LV-D report or not?

Thanks,

*Omar ElRawy*,
*LEED AP BD+C*LEED Project Manager
EA Sustainable Building Consultants
http://www.ea-buildingconsultants.com/

______________________________________________________________________
NOTICE: This communication and any attachments ("this message") may contain
confidential information for the sole use of the intended recipient(s). Any
unauthorized use, disclosure, viewing, copying, alteration, dissemination
or distribution of, or reliance on this message is strictly prohibited. If
you have received this message in error, or you are not an authorized
recipient, please notify the sender immediately by replying to this
message, delete this message and all copies from your e-mail system and
destroy any printed copies.

Nicholas Caton's picture
Offline
Joined: 2014-12-09
Reputation: 0