Good Morning -
I am working on a 65 story building in eQuest 3.64. The building is cooled
by Standard VAV units (primary cooling equipement is chillers) heated by
perimeter baseboards (steam boilers).
The first 6 floors of the building have perimeter induction units with no
re-heat. For this I have created a different loop (linked this to the
primary heating loop). This loop is called the Circulation Loop 5 in my
model. I assign this loop to the baseboard loop in the air side HVAC
parameters.
When I run the simulation I get the following error:
***ERROR***********************************************************************
Loop: Circulation Loop 5 has no attached primary
heating equipment.
I could not find anything in the archives directly to tackle this issue.
Not an expert in HVAC and hence need your advise.
snapshot of loop window:
[image: Inline image 1]
Thanks in advance.
--
*- Pranita *