Dear All.
I am getting the following warning while running equest, What needs to be
done to eliminate this error in the model?.
SPACE EL1 Core Spc (G.C39) has 0 delayed walls, 1 delayed floors and 0
delayed ceilings. There should be at least a delayed wall and floor, a
delayed wall and ceiling, or a delayed ceiling and floor for custom
weighting factors to be calculated. ASHRAE weighting factors with floor
weight of 70 lb/ft2 (342 kg/m2) will be used for this space. (lLineNum =
1000000)
Line 7871: Warning Encountered:
Advance thanks for the help.
Regards,
Kathiresan