Unmet load hours

3 posts / 0 new
Last post

Hi there, I am leaving the systems (FC and SZRH) in the building to
self size. After simulating I've noticed that the zonal loads have a
number of hours that are unmet; and after looking through the SIM file I
have noted that the self sizing calculation (design day, report LS-B) is
not registering the equipment load in the affected spaces (even though
it is shown in the space loads, report LV-B).

Is there any way that I can force DOE to recognise these loads or do you
know if there is a specific reason that it is overlooking them?

Thanks in advance, Erik

Erik Moore's picture
Offline
Joined: 2011-09-30
Reputation: 0