Hello,
I have a question regarding eQuest space type inputs. I typically
create zones in the Wizard by tracing imported CAD drawings and zoning
according to perimeter/core, same HVAC system, similar loads or space
types. However, when I get to the Activity Area Allocation screen
(screen 13 in the envelope wizard), I have to assign a percentage of
each space type to ALL the zones. Once in the detailed mode, if I check
a particular zone, it says for example Office (67%). Can I change this?
Is there a way to assign each zone only one space type and over-ride
this average area blending business. It seems like a bad way to
correctly account for different space uses. I guess the more important
question is: does it really matter? I know eQuest allows you to assign
space types either to perimeter or core or both, so there was a
conscious decision to allocate space types based on perimeter and core
and I understand the rationale since internal and external loads are
quite different. But why stop there? Why not allow full flexibility to
assign each zone a unique space type?
Thanks,
Luka Matutinovic, B.A.Sc., LEED(r) AP