I was working on my eQuest simulation for my thesis and I got 4 errors and 1 warning,
I am using HVAC DX coils with no heating,
but I got these errors in my report
any idea about them ...
thanks
Marc
" ActArea 1: -1.$% of Bldg, or 0 SqFt
********************** == ******************************************************
UNKNOWN COMMAND
Line 2037: Circulation Loop: Domestic Hot Water Loop
Line 2044: DW Heater: Domestic Water Heater
Line 2051: Warning Encountered:
INPUT-TYPE COEFFICIENTS ..
HIR-FPLR = *UNUSED*
Line 2053: Loads Report
Line 2057: Systems Report
Line 2061: Plant Report
Line 2065: Economics Report
Line 2070: Hourly Report: Hourly Report
Line 2074: End
Line 2074: Error Encountered:
INPUT DATA MUST INCLUDE AT LEAST ONE SPACE COMMAND (lLineNum = 1000000)
Line 2074: Error Encountered:
INPUT DATA MUST INCLUDE AT LEAST ONE SYSTEM COMMAND (lLineNum = 1000000)
Line 2074: Error Encountered:
INPUT DATA MUST INCLUDE AT LEAST ONE ZONE COMMAND (lLineNum = 1000000)"