Envelope requirements for Warehouse

2 posts / 0 new
Last post

Good morning,

I was wondering, do all the envelope requirements under Ashrae 90.1 2007
tables 5.5 are mandatory for Performance rating method? even if there is an
area of the building that is only heating and ventilation warehouse and the
systems will be considered system 11 for baseline? Addendum dn does not say
anything about the insulation being different than required.

Regards,

Karen Smith

Karen Smith's picture
Offline
Joined: 2012-08-30
Reputation: 0