The receptacle loads between my proposed and baseline models do not match exactly. They both come up as 0.7W/sf, but the total for the baseline is 65,322 kWh and the proposed is 65,003 kWh. Is this enough to worry about for a LEED review? I've checked that my miscellaneous loads and areas match between the models. I called CDS and they had me remove the miscellaneous control power from the equipment in the chilled and heating plants; when that didn't work they had me remove the parasitic energy from the energy recovery devices. Still no luck. Any thoughts?