Hourly Reports from Schematic Design Wizard

1 post / 0 new

Is there any way to generate hourly meter reports from the Schematic Design Wizard, without converting to the DD Wizard? I need the hourly results but do not want to convert because I will lose some of the scheduling inputs.

FlbrkMike's picture
Offline
Joined: 2015-07-08
Reputation: 0