So I've completed an equest model that is mostly ready for submission, but I have a couple of questions on the 90.1 Appendix G rules and am hoping I can get some clarification:
1) regarding unmet hours - the baseline model satisfies the unmet hours criteria, but one of the rotations violates the 50 hour rule. Is this acceptable, or do I need to make some changes.
2) Concerning lighting power density - for the proposed design, I modeled the designed lighting system (new construction) using 90.1-9.1.3 (Installed Interior Lighting Power) and modeled the baseline LPD using the space-by-space method.
3) How do I enter the correct baseline fan power to comply with G3.1.2.9? I have them calculated, but am unsure of how to enter the rating in DDE (system 3, PSZ)
Thanks for the help!
--Matt Clough