4 Pipe FCU- Refrigerant lines (supply and return) instead of CHW lines

1 post / 0 new

Hi,

I am looking to model a custom built up unit ventilator for classroom building. The UV in classroom is basically a 4 pipe FCU system. The HW is supplied by natural gas boiler. Instead of CHW water lines, an outdoor split system (air condenser)  is utilized to run the refrigerant (supply and return)lines to the UV.

In e-quest, if FC is used as system type, a CHW loop is required (which is not present in this case). Therefore, for a custom system like this, is it safe to model the air side system as "residential split unit" or "single packaged zone" and HW loop for the heating side?

Has anybody encountered such type of system before to model in e -quest?

Thanks