Does anybody know how eQuest calculates demand for process loads? I have
a base model and a proposed model that have same receptacle loads and
schedule. Consumption for both model came out exactly same, but demand
came out to be 7% higher for the proposed model. I am modeling this
building for LEED. Did anybody run into this problem?
Kosuke Kato, LEED AP