Cooling Mode Shu = SCHEDULE NOT DEFINED FOR ENTIRE RUN-PERIOD

5 posts / 0 new
Last post

Hell All,

I am having a problem with defining a cooling mode shutdown schedule
based on temperature due cooling in the winter months. When I was first
running it it would just crash the program but now it is telling me that
the schedule is not defined for the entire run period. Does anyone know
how to fix this? I am including a copy of my inp and pd2 files.

Zachary Smith

psands's picture
Offline
Joined: 2011-05-23
Reputation: 0

Zachary,

Try changing the end day in your "Cooling Mode Shutdown 2" schedule from
"1" to "31".

Regards,
Bill

William Bishop, PE, BEMP, LEED(r) AP

Bishop, Bill2's picture
Offline
Joined: 2011-09-30
Reputation: 0

If one makes a building model in equest through the wizard then opens it in the refrigeration model; is it possible to open it back up in the regular equest to change the envelope within the wizard without losing all the refrigeration detail. Currently, I have to reenter all the refrigeration equipment every time the building envelope is updated. (cannot use wizard mode in refrig version) Ideally I am looking for way to import the refrigeration equipment I have from one model into various other models created in the wizard.

Thanks for the help

Patrick Wilkinson, PE, LEED AP

wilkpatr's picture
Offline
Joined: 2011-07-06
Reputation: 0

Hi Patrick,

You can't go from the Detailed Edit mode back to the Wizard in any version
of eQUEST without losing the changes you made in the Detailed Edit mode.
There are ways to cut and paste input from one .inp file to another if you
are familiar w/the BDL.

Carol

That being said, there are

cmg750's picture
Offline
Joined: 2010-10-05
Reputation: 0

I agree with Carol, and a text comparison software will help you to do such
work.

Normally I use Winmerge, small size, open source, and you can use it without
installation.

grammy's picture
Offline
Joined: 2010-12-09
Reputation: 0