To All:
I have been modeling a cogeneration plant and I've run into a problem. The plant tracks-thermal for EM1 but when I look at the BEPS, BEPU, and ES-D reports, I have a negative kWh even though I have made a surplus meter! Does anyone have any helpful guidance? Thank you.
I have attached the hourly outputs from the meters and the cogeneration plant as well as the BEPS, BEPU, and ESD reports.
John Grando LEED AP