Claiming savings from receptacle loads

2 posts / 0 new
Last post

Hi,

IBC 2012 requires occupancy sensors on receptacles for space types. The C&S building I am modeling is using LEED V3 (90.1 2009).

I would like to claim savings on receptacle loads by reducing my receptacle schedule in the proposed model to 0% during unoccupied hours (down from 5%) and possibly lower my percentages during occupied hours to account for vampire loads.

Has anyone had success claiming savings for receptacle load reduction in terms of getting it through USGBC? Any documentation or procedures you could point me to that would be helpful?

Thanks,

Nicholas E Blanton LEED AP BD+C
Mechanical Engineer

Arup
1120 Connecticut Avenue NW Suite 1110 Washington DC 20036 USA
t +1 202 729 8220 d +1 202 729 8241
m +1 505 228 4154
www.arup.com
____________________________________________________________
Electronic mail messages entering and leaving Arup business
systems are scanned for acceptability of content and viruses

Nicholas Blanton's picture
Joined: 2014-01-16
Reputation: 0