FYI...
You can do this with DOE-2 or EQUEST by cutting off the simulation at the SYSTEMS portion and summing
the chilled water and hot water that goes to PLANT. I believe you'll find the information you need in the
SS-D report for the total loads going to PLANT.
Jeff S. Haberl, Ph.D., P.E