Ashrae Appendix G: thermal zones

2 posts / 0 new
Last post

Going over ASHRAE appendix G i noticed that for buildings where thermal zones have not been defined use the perimeter method, 15ft from perimeter. However i am building a core and shell model where the core/lobby on each floor is defined. it is still recommended to use the perimeter zone method in combination with defining the building core zones

Erik Weiss's picture
Offline
Joined: 2011-09-30
Reputation: 0