Hi All,
A quick baseline system type question following Appendix G (as I am in Canada and not that familiar creating ASHRAE baselines buildings):
I have a one floor non-residential building, approx. 7,800 sq.ft, with an air cooled chiller primarily serving a VAV system, with either no heating or electric heating if needed. Following Appendix G Table G3.1.1A, I understand I should be comparing my VAV system to a PSZ-HP?
Furthermore, each TZ should have its own system modeled?
Hoping for some corroboration on this as it seems weird to me.
Thanks a lot,
Adam Barker