Hello,
The baseline building shows the following consumption distribution.
HVAC - 40%
Lighting - 10%
Misc Equipment - 50% (includes Office equipments, Lifts/Escalator, Misc
equipments, Water/sewage/fire system loads)
The overall savings of proposed model is much less than 10% savings,even
if the proposed model saves 20% in HVAC , 20% in Lightings & nothing in
MISC loads.
Whereas EAC1 require 12% savings for core and shell bldg to achieve
minimum 3 points.
My question is
What needs to be done to get the EA credit other than HVAC and lightings?
Is it possible to reduce the MISC Equipments loads (ie process) & use it
for saving calculation?. How we can reflect that in eQuest.(as 90.1 says
both baseline and proposed models should have same loads).
or any ideas to maximise the EA Credit points.
Thanks for your contribution.
Regards,
Kathiresan
-