I'm modeling a 30,000 sf addition to an existing building that's 3
floors above an existing 2 floor building. It has its own chiller and
natural gas boiler. In Table G3.1.1A should I select System3 assuming 3
floors, or should I select system 5 assuming 5 floors?
Vikram Sami, LEED AP