Hi All,
I am still fairly new to equest and I am having a bit of trouble with
setting up my HVAC. I created a building model using the equest wizard and
now I have made a number of changes within the detailed DOE2 interface. The
building uses air source heat pumps for the HVAC and I would like to change
the EER/COP values without going back to the wizard, but I cannot figure
where these values are stored. Is there an easy way to make changes like
that within DOE2?
Thanks,
Michael Shields