About unmet hours

2 posts / 0 new
Last post

Dear all,

I'm trying to reduce the unmet hours in my model. The strange thing is that all zones are carefully controlled, meeting temperature requirement (checked in SS-R and SS-F report). Most of their unmet hours are zero, and few of them have some dozen of unmet hours but no more than 80.

However, the overall unmet hours of my model is still above 1500 (Checked in report BEPS).

Has anyone been faced with the same problem? Is there any solution?

Thank you!

Sherry

=?ISO-8859-1?B?RHU=?='s picture
Joined: 2011-12-07
Reputation: 0