Optimum start is a control strategy that initializes building conditioning (heating or cooling) prior to occupancy based on a building's computerized controller
Example:
The building had reached it's driftpoint temperature of 65 degrees overnight; the building controller computed that it would need to start heating 2 hours early, so that the building would be at it's setpoint of 70 degrees when it became occupied