Dear Sirs,
I use system PIU in order to model the system 6 (Packaged VAV with PFP
Boxes) of the baseline case.
Firstly, I would like to ask if the cool and heat design temp has to
be identical to those of the proposed model.
Secondly, equest ask to define the zone fan temp schedules, is it a correct
approach if I create a schedule with the cool design temp (24 hours) and
assign it to all zones.
If not could you please suggest any other approach?
Thank you.
Regards,
Eva