I am a modeling a school (new construction) with water-source heat pumps,
demand-controlled ventilation, and a rooftop energy recovery unit with
separate ductwork and VAV boxes that supplies 100% of the outside air.
Is there any way to accurately model this in eQUEST v3.64, or must I find a
work-around? My review of the archives didn't turn up very much except more
people with the same problem.
Thank you in advance,
Ben Pressman, EIT, BESA