VAV with FP Boxes

1 post / 0 new

I've been beating my head against the wall trying to figure this out. The attached inp and pd2 file are the 90.1 baseline for a model which works. I have many many unmet heating hours. The ctrls options were not changed between my design and the baseline, only the system type. Can someone with more equest experience help me?

Dug Gwalt2's picture
Offline
Joined: 2011-10-02
Reputation: 0