schedule error in EnergyPlus v.7

1 post / 0 new

Hi,

I have modelled a radiant system with an availability schedule of six months
in EnergyPlus v 7. Now I want to perform a study for the whole year. As I
make changes in the schedule my model is crashing. Can anyone suggest the
solution.

Thanks,

With regards,

Sachin Sharma

Sachin Sharma's picture
Offline
Joined: 2011-09-30
Reputation: 0