I have a scenario that I am not sure about:
If you have a building (1 address) that consists of 2 three floor buildings with a enclosed walkway link. Same schedules and similar use. Assume a system 7. Do I use 3 systems (one per floor), or 6 systems (one per floor per "building"). I think it makes more sense to go with 6, since it is closer to reality, but I can't find anything in appendix G that would support that.
Any thoughts?
Brendan Hall