Folks:
I am modeling a chilled beam demonstration area. In one room the owner will be
installing a split AC system with electric heat in order to provide a false load
for the chilled beams.
The primary air to the 3 chilled beams is provided via VAV terminals from an
ERU. The ERU is equipped with chilled and hot water coils.
I can simulate a false cooling load by adding equipment under the Internal Loads
tab. I don't know how to make the room colder during the summer months in order
to require more heat from the chilled beams.
Any ideas on how to simulate a false heating load into this space?
Thank you,
Paul Diglio, CEM, CBCP