Hello All,
I have created a separate meter to monitor a projects chilled water
pumps. My goal is to remove the pump energy/cost from the project
reports (BEPS,BEPU, ES-D) but I can't figure out how.
Is this possible? I have created a "utility" meter and turned the
"report" to "no" but the energy and electric cost still show up on the
reports.
Thanks for the help!
Seth Spangler, LEED(r) AP