LEED baseline building loop operation

1 post / 0 new

Hi All,

Does anyone know whether the LEED baseline building hot water loop operation
should be "standby" or "demand"? I've always used "standby", but now I'm
not so sure.

Thanks,

--
Karen

No Username provide's picture
Joined: 2011-09-30
Reputation: 200