Hi guys
I'm simulating a very complicated DES plant. the plant has 3 double-duty chiller(ice storage charging at night, and cooling in daytime), one GSHP, one heat recovery screw chiller and one steam absorption chiller. heating source is frome municipal steam and GSHP. I've got the cooling and heating load schedule for the plant. the question is how to give the control stragtegy for simulation, as the construction drawings doesn't give the detailed strategy. Also we want to optimizing the operation strategy by energy simulation.
I've set rough equipment controls and load management as below
but from SIM file as below, the ice chiller consume no energy, while the ice storage works.
could anyone help to fix my problems?
thanks
Best wishes
Aaron Zhou