Eric,
Try this:
$ Create a schedule for OA reset
SD-01-RC = DAY-RESET-SCH
SUPPLY-HI = 180
SUPPLY-LO = 150
OUTSIDE-HI = 50
OUTSIDE-LO = 20
..
SY-01-RC = RESET-SCHEDULE
THRU DEC 31
(ALL) SD-01-RC
..
Then in your plant, look at your Hot Water supply reset and make the
change below.
HW-SUPPLY-RESET = LOAD-RESET.
This should work
Hayssam Barhoun, Ph.D., AP LEED, Ing.