[Hap-users] Utility Rate Question

1 post / 0 new

Hello,

I was wondering if the block utility rates need to be entered in step
increments where for example the first 250 kWh is $___, the next 150 kWh
is $____ and so on, or if it needs to be entered in cumulative
increments where the first 250 kWh is $____, from that up to 400 kWh is
$_____ and so on.

thanks,

Nick Couture, LEED AP

Mechanical Engineer

3555 Veteran's Memorial Highway, Suite M
Ronkonkoma, NY 11779
Tel: 631.981.3990 ext. 230
Fax: 631.981.3971
ncouture at emtec-engineers.com

www.emtec-engineers.com

This message is intended only for the personal and confidential use of
the designated recipient(s) named above. This is not in anyway an
official statement of Emtec Consultants or solicitation to buy our
services. Emtec Consultants does not guarantee this Email transmission
to be secure or error-free. Any reproduction or changes to our drawings
and files without the consent of Emtec Consultants is strictly
prohibited.

Nicholas Couture, LEED AP's picture
Joined: 2011-09-30
Reputation: 0