Time of Design Peak Load

3 posts / 0 new
Last post

Hi,

I don't know if this has happened to anyone else in their HAP calculations. But I built a project in HAP, and the cooling design peak load is occurring at September (with small loads) when it normally should be occurring in July. I am not sure why the calculations are doing that. Has anyone else run into this problem?

Thanks and Regards,

Kate Mayberry

Kathleen Mayberry's picture
Joined: 2012-11-12
Reputation: 0