Hi,
I don't know if this has happened to anyone else in their HAP calculations. But I built a project in HAP, and the cooling design peak load is occurring at September (with small loads) when it normally should be occurring in July. I am not sure why the calculations are doing that. Has anyone else run into this problem?
Thanks and Regards,
Kate Mayberry