eQuest v3.64, build 7130 (assigned loads)

1 post / 0 new

Help needed..... I'm trying to customize my hourly report outputs. In detailed mode I can produce an assigned load for my chiller. It appears this load is the building load + the loop losses. Can someone confirm this for me, or help me out and tell me what this assigned load is actually defined as.

Thanks,
[cid:image001.png at 01CBA6AE.14ED2FC0]

JAMES HURLEY

James Hurley's picture
Offline
Joined: 2011-09-30
Reputation: 0