Dear All,
I have a walk-in refrigeration room, and I am trying to ignore it in the
Air-side or Water- side HVAC tab. How to do that? I cannot delete it from
HVAC, coz equest will report an error. I cannot ignore it in the building
shell and internal loads, coz I need input its process load. What should I
do to deal with this room?
Jing
--
PhD Candidate, LEED AP BD+C
School of Architecture and Urban Planning
University of Wisconsin-Milwaukee