Hourly reports

2 posts / 0 new
Last post

Hi,
I created a hourly report (with appropriate schedules and report blocks). I
ran simulation and searched for spreadsheet or CSV files in the project
folder assuming that's the place the output report would be placed. I see
### Design_EG_MoEU_ED.csv which does not have what I'm looking for. I
created blocks to report "elec input to heat (kw)" for the HVAC system.

Could someone please help me to figure this out?
Thanks,

--
Jimmy Jungle

jimmy jungle's picture
Offline
Joined: 2011-09-30
Reputation: 0