I have a project fully defined and can output information at full load.
I know (I think I know) that linear losses are assumed for equipment. My question is two fold:
1) How can I input an efficiency curve that I can use to show losses of (for example) a UPS at certain partial loads
2) What is the best way to run an IT system at partial load, and calc the PUE given the cooling/fan/etc load?
Thanks,
Ryan